• Municipal Committee Kot Addu

Guidelines For Registration Of Birth, Death, Marriage & Divorce

Guideline for Installation of Water Connection

It is necessary that the water supply pipeline should pass near the house of the applicant.

The procedure for getting a new water connection

  • 1- Application form to be obtained from TO (I&S) office
  • 2- Water Supply Incharge reports – field condition
  • 3- Sub-Engineer verification
  • 4- Allowed by a competent authority in Municipal Committee
  • 5- Fee charges deposited

Documents Required for application

  • 1- Ownership papers of the property
  • 2- Copy of NIC

Types of Connections

The following types of connections are sanctioned:
  1. 1- Domestic (Metered)
  2. 2- Commercial (Metered)
  3. 3- Industrial (Metered)
  4. 4- Charitable
× How can I help you?